This week Group B worked on a wattle and daub panel for one of the long sides of the house. It took about an hour to gather and strip the materials to build it, and since we were in an area with somewhat slim pickings for willow, we ended up with a few ash saplings…
(Group A) Lab Journal #9: Hut Construction pt.2
This content is password protected. Enter the password to view it.
Week 9 Lab (Group E)- Mortuary House Building
This content is password protected. Enter the password to view it.
ARCN222, Lab 9 – Mortuary House
This content is password protected. Enter the password to view it.
Group C Data, Week 9
As part of our experimental archaeology lab, we constructed a mortuary structure designed to reflect early burial practices. The final structure consisted of three woven willow walls, one plank wall, and a roof thatched with natural materials. Our group, Group C, was responsible for building one of the woven willow panels. We collected approximately 40…
Week 9 Lab Group E Data
This content is password protected. Enter the password to view it.
Lab Week 9
This content is password protected. Enter the password to view it.
Lab 9: Building—Ian Rock-Jones
This content is password protected. Enter the password to view it.
Week 9 Lab Journal – Building
This content is password protected. Enter the password to view it.
Lab Journal – 9th week
This content is password protected. Enter the password to view it.
