Week 8 Lab Data: Woodworking (Group F)

Cutting + Shaping

Resultant LogNumber of Logs Total Time to Produce Logs
4ft Log418 minutes
3ft Log413 minutes
Cutting trunk into 4ft logs

Foundation Area

Task Total Time to Complete Task
Remove Remaining Sod from the Marked Area18 minutes
Dig Post Holes and Log Trenches25 minutes