During these last 2 weeks of lab, we built a funeral structure (the original plan changed due to adverse weather conditions. Earlier in the week, we collected several posts & lots of branches from the wood pile, each at least 4ft long and of varying levels of thickness. Friday We mapped out the area necessary…
Astrid Malter, David Bellovin, Ellen Schlick Introduction Over the past week, the class has been working on our final lab: building a mortuary house from natural materials. Although this lab can stand alone as a unit, we would not have been able to accomplish the build without what we had learned in previous weeks. For…